
Drift will be made to remove water from Silkyara Tunnel
Drift will be made to remove water from the tunnel, work will be started from March 15. There was preparation for protective work inside the tunnel also. For this, 50 bags of sand were also brought inside, but later this work was suddenly stopped. After this, the new MD of NHIDCL along with the Executive…